Join our community
Stay updated on the latest innovations and insights in automation.
Have an account? Log in to check out faster.
Product Model :LET BS88:4
Product specifications: Current 260A, AC voltage 240V
Product Note: new original
Fuse use precautions:
1, the protection characteristics of the fuse should be compatible with the overload characteristics of the protected object, taking into account the possible short-circuit current, choose the corresponding breaking capacity of the fuse;
2, the rated voltage of the fuse to adapt to the line voltage level, the rated current of the fuse should be greater than or equal to the rated current of the melt;
3, the rated current of the fuse at all levels of the line should be matched accordingly, and the rated current of the previous melt must be greater than the rated current of the next melt;
4, the fuse of the melt should be used as required, and it is not allowed to increase the melt or replace the melt with other conductors.
Fuse inspection:
1. Check whether the rating of the fuse and melt is compatible with the protected equipment;
2, check the appearance of the fuse for damage, deformation, porcelain insulation part for flicker discharge traces;
3, check whether the contact points of the fuse are intact, close contact, and there is no overheating phenomenon;
4. Whether the fuse signal indicator is normal.
Fuse service maintenance:
1. When the melt is fusing, the reasons for the fusing should be carefully analyzed. The possible reasons are:
1) Short circuit fault or overload operation and normal fusing;
2) The use time of the melt is too long, the melt is oxidized or the temperature is high in operation, so that the melt characteristics change and break;
3) There is mechanical damage when the melt is installed, which makes its cross-sectional area smaller and causes error in operation.
2. When disassembling the melt, it is required to:
1) Before installing the new melt, it is necessary to find out the cause of the melt meltdown, and do not disassemble the melt for test sending before determining the cause of the meltdown;
2) When replacing the new melt, check whether the rating of the melt matches the protected equipment;
3) When replacing the new melt, check the burn inside the fuse tube, if there is serious burn, the fuse tube should be replaced at the same time. When the porcelain fuse is damaged, it is not allowed to replace it with other materials. When replacing the melt, pay attention to filling the filler.
3, the fuse should be repaired at the same time as the power distribution device:






JJSR Electronics One-stop MRO Solution Service:
As different MRO products come from different sources, it takes time to collect various quotations. JJSR offer one-stop MRO solution, covering PLC, contactors, breakers, fuse, sensor, fans, elevator parts and etc. We have the latest and complete MRO information and electronics. We can provide you with the latest quotation quickly. Welcome to send us RFQ List!


Shipment Items Channels:
Express: DHL / UPS / TNT / FedEx / EMS / Aramex etc....
AirPost: Post-NL / Singapore Post / ePacket / CDEK /
Hongkong Post / DHL eCommerce / PTT etc....
Normal Post: China Post etc....
Remark: Support your own account

Frequently Q&A:
| ITEM CONDITION | NEW FOR OWN USE/RESELL |
| QUALITY | GOOD |
| SERVICE | GREAT BEFORE AND AFTER-SALE SERVICE |
Q: Do you have any stock or need buy from other suppliers?
A: We saved lots of stocks for selling. RTS is our advantage, we have our own warehouse.
Q: Is there any engineer can help for technical supporting?
A: Sure, we have. Our technical team can help you. If you need any help, you can contact our technical department directly.
Q: Do you sell obsolete products? even very old products?
A: If there is new type to replace, we will suggest you to use new one; if not easy for change, we will help to check the old one with good condition. If used or other conditions, we will tell you the truth.
Q: How about Customs Duty & Handling Fee?
A: For all customers orders, we do not charge handing fee, even 1pcs part. When parts arrive at your local custom, if the parts were charged customs duty, we are not responsible for any customs duties or import taxes.
Q: How long is your delivery time?
A: Generally 2-3 working days if the goods in stock. If large quantity, it will take 5-7 working days after getting the payment.
If not common products, always need 3-4 weeks or 6-8 weeks to order.
Q: Do you have samples? is it free or extra?
A: No. i am sorry, we have no Sample.
Q: What is your terms of payment ?
A:TT, WEST UNION and MoneyGram (100% payment in advance if goods in stock; 30% payment in advance, balance before shipping if long delivery)